MUMTAZ

Post-Construction Termite Treatment in Dubai & Sharjah

Overview

Post-construction termite treatment protects a building that is already standing, where the soil under the slab can no longer be reached from above. MUMTAZ carries it out in Dubai and Sharjah for villa owners, landlords, building managers and buyers who have found mud tubes, hollow timber or a swarm, and for new buildings whose pre-construction stages were missed. We are approved by Dubai Municipality and Sharjah Municipality for anti-termite treatment and have done this work since 2006.

Every job starts with a survey, because the treatment goes where the termites are getting in, not where they happen to be seen. From what the survey finds we propose drilling and injection, a treated soil band around the building, baiting, or a combination, in writing, before any work starts. The household normally stays in, and a follow-up inspection is scheduled to confirm the routes are no longer active.

Signs of termites in a finished building

Mud tubes are the clearest sign: pencil-width earth tunnels running up a foundation, an external wall, the back of a kitchen unit or the inside of a service duct. After them come door frames and skirting boards that sound hollow or give under a thumb, paint that blisters or ripples over timber, small piles of discarded wings on window sills after a swarm in the warmer months, and stored boxes or paper that crumble at the bottom.

In UAE villas the activity is often found first in the places that stay damp: under kitchen and bathroom units, along a wall where irrigation runs against it, behind wardrobes on an external wall and around a pergola or timber deck. Flying ants are commonly mistaken for termites; the survey settles which it is.

The survey: finding the route, not just the termites

The technician traces the activity back towards the ground: where tubes enter the building, which walls and floors they cross, whether service entries, expansion joints or cracks in the slab are being used, and how the garden, irrigation and paving sit against the walls. The survey also records construction type, because a villa with a suspended floor, a slab-on-grade apartment and a compound wall are three different jobs.

From that comes the proposal: which walls and floors are drilled, how long the treated band around the outside is, where bait stations would go if baiting is chosen, and which conditions need correcting by you or your maintenance contractor so the treatment is not undermined.

Drilling and injection through floors and paving

Where termites are reaching the building through the soil under a slab, holes are drilled through the floor or the external paving at regular intervals along the affected walls and around penetrations, and termiticide is injected into the soil beneath so the treated zones join up into a continuous line. The holes are then sealed. Inside a home the drilling is planned around furniture and finishes, and we agree with you beforehand which rooms are done and in what order.

Perimeter soil treatment around the building

Outside, a band of soil along the external walls is treated by trenching or by rodding, so the building is ringed by treated ground rather than a line of separate spots. Planting beds against a wall are a common gap and are treated with care for what is growing in them. Where a garden, a pool deck or a boundary wall runs up to the building, the proposal says how the band crosses it.

Baiting, where drilling is not practical

Some buildings cannot reasonably be drilled: marble or stone floors throughout, water features against the walls, a newly finished garden, or an occupier who cannot have the work done indoors. For those we install bait stations in the ground around the building, and where activity is found, inside it. Termites carry the bait back to the colony. Baiting is slower than a soil treatment and depends on the stations being checked and serviced, which is part of the scope from the start.

Fixing what brought them in

Termites in a finished building almost always point to moisture or soil contact: irrigation wetting a wall, a slow leak under a sink, soil or planters banked above the damp-proof course, or timber stored against the house. The report names each one with its location. Treatment without those corrections is treatment working against the building, so we say so plainly rather than leave it for the follow-up visit to discover.

This is one of the programmes run by our pest control in Sharjah division.

How it works

Post-Construction Termite Treatment, step by step

  1. 01

    Survey

    Structure, perimeter, service voids and garden checked for routes, damage and the conditions inviting termites in.

  2. 02

    Written proposal

    Method, treated lengths and areas, or bait station positions, quoted in writing.

  3. 03

    Treatment

    Drilling and injection, perimeter soil treatment, baiting or direct timber treatment, as proposed.

  4. 04

    Record

    Product, locations, drilled lengths and findings recorded in the service report.

  5. 05

    Follow-up

    A scheduled return visit to confirm the routes are inactive, and bait stations serviced where used.

Scope

Post-Construction Termite Treatment, what is included

Included in the scope

  • A survey of the structure, perimeter, service voids and garden
  • A written proposal naming the method, treated lengths and areas
  • Drilling and injection through floors and paving, holes sealed after
  • A treated soil band along the external walls by trenching or rodding
  • Bait stations installed and serviced where baiting is chosen
  • Direct treatment of infested timber and voids where activity is found
  • A service report and a scheduled follow-up inspection

Quoted separately

  • Repair or replacement of damaged timber, doors, frames and joinery
  • Lifting and relaying tiles or stone beyond sealing the drill holes
  • Plumbing, irrigation and waterproofing corrections named in the report
  • Any promise that termites will never return to the property

Compliance & Certification

Approved by Dubai Municipality and Sharjah Municipality for anti-termite treatment.
MOCCAE-approved termiticides and bait products
used at label rates.
Re-entry period for treated rooms stated before the team leaves.
ISO 45001:2018 for drilling
dust and chemical handling in occupied homes.

Where we work

Post-Construction Termite Treatment, where we do it

  • Villas and townhousesKitchens, wardrobes on external walls, garden edges, pergolas and decks.
  • Ground floor apartmentsSlab penetrations, service entries and skirting on external walls.
  • Properties being bought or soldA survey report on what is active, what is damaged and what was treated before.
  • Offices, shops and warehousesPartition timber, raised floor voids, pallets and stored paper.
  • Schools and labour accommodationGround floor rooms and stores, scheduled outside occupied hours.

Post-Construction Termite Treatment, where the work comes from

The districts this work comes from most. Serving clients across the UAE from offices in Sharjah, Dubai and Abu Dhabi.

Dedicated MUMTAZ teams cover Al Zahia and Aljada in Sharjah, and JVC, JLT and JVT in Dubai. Elsewhere the job is assigned from the nearest of our three offices.

The difference

Why MUMTAZ

  • Approved by Dubai Municipality and Sharjah Municipality for anti-termite treatment

  • Survey first: the method is chosen for what is found

  • Drilling, perimeter treatment and baiting from one team

  • A service report and a scheduled follow-up on every job

Get a quote

Request a Quote

FAQ

Frequently Asked Questions

Termites have straight antennae, a thick waist and two pairs of wings of equal length; flying ants have elbowed antennae, a pinched waist and a shorter back pair. Keep a few in a sealed bag or take a clear photo and send it on WhatsApp.

Only where the survey shows termites reaching the building under that floor. Otherwise the work is outside, along the walls. Where indoor drilling is not acceptable, baiting is used instead.

Usually yes. Rooms being drilled are cleared of people for the work, and the technician states the re-entry period before leaving.

It depends on the length of wall to be drilled and treated; the survey gives the number of days in writing before the work is booked.

Yes. A pre-purchase survey reports what is active, what timber is damaged, any sign of earlier treatment and the conditions that will bring termites back. Ask the seller for any previous treatment record too.

Yes. Card on site at the time of service on our technicians' terminals, by payment link, Apple Pay, Google Pay, bank transfer or cheque. Payment is taken on completion of one-off work, and on the agreed schedule for annual contracts. Every price we publish is incl. VAT.

Every job starts with an inspection, the treatment is chosen for what the inspection found, a follow-up visit is scheduled, and you receive a written service report. How we treat, and what happens after the visit

You may also need

CallWhatsAppGet Quote