MUMTAZIntegrated Services Group

Post-Construction Cleaning in Dubai, Sharjah & Abu Dhabi

Overview

MUMTAZ cleans newly built and newly fitted-out property so it can be handed over: villas and apartments, office and retail fit-outs, warehouses, clinics and hotels, across Dubai, Sharjah, Abu Dhabi and the northern emirates. The work removes construction dust from every surface including the ones nobody thinks about, takes off protective film, stickers, paint spots, adhesive, grout haze and cement residue, and finishes with a detail clean so the space presents at handover. We work to your snagging and handover dates, including nights and weekends, and hand over a photo report.

This is not deep cleaning with a different name. Construction dust is abrasive, alkaline and extremely fine, it settles inside ceiling voids, behind AC grilles, in door tracks and socket boxes, and it will keep reappearing for weeks if the first clean only covered visible surfaces. Handled wrong, it scratches new glass and polished stone permanently.

Why builders clean is a different job

Ordinary cleaning removes soil from surfaces that are otherwise finished. A builders clean deals with residues bonded to brand-new finishes that are easy to ruin: cement splashes on tile, grout haze on porcelain, silicone smears on glass, plaster dust ground into unsealed stone, adhesive from protective tape on powder-coated aluminium, and paint spots on everything.

Each of those needs the right method. Grout haze comes off with a mild acidic wash on tile that tolerates it, and takes the polish off natural stone that does not. Blades will lift paint from glass, and will scratch coated glass permanently. Protective film left in UV for months bakes its adhesive on and needs solvent and patience rather than force. Getting this wrong on a handover is expensive, because the remedy is replacement rather than recleaning.

The other difference is that dust is everywhere, not just on the floor. It sits on top of door frames and ceiling grilles, inside cupboard carcasses, in shower channels, in switch and socket boxes, behind skirting, and in the AC ductwork. If it is not removed at the right stage it circulates as soon as the system runs, and the client sees a film on every surface a week after moving in.

Stages: rough, main and final clean

On larger projects the sensible pattern is three passes rather than one heroic clean at the end. A rough clean during construction clears debris and bulk dust so trades can work and so dust is not being ground into new finishes. A main clean follows the completion of wet trades and painting, dealing with residues while they are fresh, cement and grout come off far more easily before they cure hard.

The final clean happens after snagging works are complete and just before handover. This is the detail pass: glass and mirrors, ironmongery, switch plates, skirting and door tops, inside cupboards and wardrobes, sanitaryware, and the floor finish. Scheduling it too early is the most common and most expensive mistake, because snagging trades will put dust straight back into a cleaned space.

For single villas and small fit-outs one thorough clean is often enough, but the same sequencing logic applies: it should follow the last dusty trade, not precede it.

Working to a handover deadline

Handover dates rarely move, and the cleaning is at the end of the chain, so it absorbs everyone else’s delay. We plan for that: crew sizes are scaled to the deadline rather than to a comfortable schedule, and we work nights and weekends where the programme demands it.

What we need from you is honest sequencing. If painters will return, tell us, cleaning ahead of them wastes the visit. Live power and water on site matter more than people expect, because without them there is no vacuum, no scrubber and no rinsing. Site access, lift availability and waste routes are the other three things that decide whether a crew is productive or standing around.

We also flag defects rather than cleaning over them. Scratched glass, chipped stone, damaged powder coating and stained sanitaryware are recorded with photographs at handover, so it is clear those were pre-existing rather than caused by the clean.

How it works

Our Process

  1. 01

    Site Visit & Scope

    We walk the site to assess finishes, residue types, area and the trades still to complete, then agree the stage and date.

  2. 02

    Debris & Bulk Dust

    Construction debris and loose material are cleared, and bulk dust is removed from floors, voids and high level before detail work begins.

  3. 03

    Residue Removal

    Protective film, stickers, adhesive, paint spots, grout haze and cement residue are removed with the method matched to each finish.

  4. 04

    Detail Clean

    Glass, ironmongery, switch plates, door tops, cupboard interiors, sanitaryware and floor finishes are cleaned to handover standard.

  5. 05

    Inspection & Handover

    Joint walk-through against the scope, with a photo report and any pre-existing damage recorded so it is not attributed to the clean.

Scope

What's Included

Included in the scope

  • Construction debris and bulk dust removal
  • Protective film, sticker and adhesive removal
  • Paint spot, grout haze and cement residue removal
  • High-level dusting including door tops, frames and ceiling grilles
  • Internal glass, mirror and partition cleaning
  • Cupboard, wardrobe and drawer interiors
  • Sanitaryware, ironmongery and switch plate detailing
  • Floor finish cleaning matched to the material, plus a photo report

Quoted separately

  • Snagging and remedial building works
  • External facade and window cleaning at height, quoted separately
  • AC duct cleaning, quoted through our duct cleaning service
  • Skip hire and disposal of construction waste
  • Floor polishing, grinding, sealing and stone restoration
  • Repair of pre-existing scratches, chips or staining

Compliance & Certification

ISO 9001:2015 quality management
cope, inspection and photo handover on every project.
ISO 14001:2015 environmental management
ontrolled chemical selection, use and disposal.
ISO 45001:2018 occupational health and safety
he standard governing our work on live sites.
Method statements and risk assessments issued for main contractor permit-to-work systems.
Trade licence 546486
perating in the UAE since 2006 with over 100 trained technicians.

Where we work

Where We Do This Work

  • Villas & TownhousesNew-build and renovated homes cleaned to handover standard for developer or owner.
  • ApartmentsSingle units or floor-by-floor programmes in newly completed towers.
  • Office & Retail Fit-OutsPost-fit-out cleans scheduled around snagging and mall handover deadlines.
  • Warehouses & IndustrialNew sheds and extensions, including high-level structure and floor slabs.
  • Clinics & NurseriesSpaces needing a detail clean before inspection and licensing.
  • Hotels & F&BGuest rooms and kitchens cleaned to opening standard, phased by floor or zone.

Areas We Serve

The difference

Why MUMTAZ

  • Methods matched to each finish, so new glass and stone are not damaged

  • Crews scaled to the handover date, including nights and weekends

  • Pre-existing damage photographed at handover, not cleaned over

  • Staged rough, main and final cleans on larger projects

  • Method statements and risk assessments for main contractor permits

  • Can be combined with duct cleaning and pest control before occupation

Get a quote

Request a Quote

FAQ

Frequently Asked Questions

Deep cleaning removes soil from finished, occupied space. Post-construction cleaning removes building residues, cement, grout haze, adhesive, paint, fine abrasive dust, from brand-new finishes that damage easily, and it covers places an occupied-home clean never reaches, such as ceiling voids, socket boxes and door tracks.

After the last dusty trade has finished, including snagging works, and as close to handover as the programme allows. Scheduling it before snagging is the most common and most expensive mistake, because returning trades put dust straight back into a cleaned space and the clean has to be repeated.

Yes, that is part of the scope. Film left exposed to UV for months bakes its adhesive onto the substrate and needs solvent and time rather than force, so tell us at survey how long it has been on, it changes the hours involved.

Not if the method matches the finish, which is exactly why we assess finishes before starting. Blades take paint off standard glass but destroy coated glass; a mild acid wash clears grout haze from porcelain but dulls natural stone. Where a finish is uncertain we test a discreet area first.

We clear debris into the site waste facilities provided. Skip hire and disposal of construction waste are the main contractor’s responsibility and are not part of our scope, though we will tell you at survey if what is on site exceeds what the existing arrangements can take.

Yes. Handover dates rarely move and cleaning sits at the end of the chain, so it absorbs earlier delays. We scale crew size to the deadline and work outside normal hours where the programme requires it.

Not within this scope, but it is worth doing before occupation because construction dust settles in ductwork and circulates as soon as the system runs. It is quoted through our AC duct cleaning service and often carried out in the same window.

We photograph and record it at handover rather than cleaning over it. Scratched glass, chipped stone, damaged powder coating and stained sanitaryware are noted so it is clear they were pre-existing, which protects both sides in the handover conversation.
CallWhatsAppGet Quote